The Guangxin leg production project is proceeding in an orderly manner
- Categories:Company News
- Author:
- Origin:
- Time of issue:2015-04-14
- Views:0
(Summary description)Guangxin SZ200LB-150 is a self-propelled, self-elevating residential platform with a total weight of 6008.7 tons, four cylindrical rack-type legs, each leg is 89.4 meters long.
The Guangxin leg production project is proceeding in an orderly manner
(Summary description)Guangxin SZ200LB-150 is a self-propelled, self-elevating residential platform with a total weight of 6008.7 tons, four cylindrical rack-type legs, each leg is 89.4 meters long.
- Categories:Company News
- Author:
- Origin:
- Time of issue:2015-04-14
- Views:0
Guangxin SZ200LB-150 is a self-propelled, self-elevating residential platform with a total weight of 6008.7 tons, four cylindrical rack-type legs, each leg is 89.4 meters long.
Nantong Landau Offshore Engineering Co., Ltd. is mainly responsible for the construction, transportation and on-site assembly of these four pile legs. Each leg will be constructed in 3 sections, and the total construction period is expected to be three months.
At present, the Guangxin leg is in the stage of cutting, rolling and welding the longitudinal seam of the main cylinder of the leg, and all work is being carried out in an orderly manner.
Scan the QR code to read on your phone
Recommended News
Nantong Taisheng Blue Island Offshore Co., Ltd.
Tel:
Address:
No.1,Blue Island Road,Marine&Offshore Industrial Park, Qidong City, Jiansu Province. Province
Copyright © 2021 Shanghai Taisheng Wind Power Equipment Co.,Ltd. 沪ICP备11022703号